Other Projects
1. Banias Power Plant heavy Fuel Oil pipeline
- Engineering, Procurement, Construction, Commissioning & Start-up "EPCC"
-
Project Duration: 2001-2002
-
Heavy Fuel oil 12”x 9.2 km pipeline, polyurethane insulated and PE coated
-
Gas Oil Flushing System comprising of tank, pipeline pumps, and network
-
Pipeline Leakage Detection System
-
Control System & SCADA
-
2. Aleppo Fiscal Metering Station for Natural Gas
-
Engineering, Procurement, Construction, Commissioning & Start-up "EPCC"
-
Project Duration: 2002-2003
-
Natural Gas Fiscal Metering Station at the inlet of Aleppo Power Station
-
Horizontal type filter separator
-
Flow metering system using Orifice type meters
-
3. Adra Truck Loading Automation for 35 loading arms
-
Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”
-
Project Duration: 2002-2003
-
(35) Top Loading arms for Gas Oil & Gasolin
-
Truck Loading Automation System for each individual Truck
-
Flow metering System
-
Control System & SCADA
-
4. Lattakia new Terminal & Management offices with Storage Tanks for Petroleum Products
-
Engineering, Procurement, Construction, Commissioning & Start-up "EPCC"
-
Project Duration: 2004-2006
-
New Tank Terminal for Storing Gas Oil & Gasoline:
-
(2) x 10,000 m³ Fixed Roof Storage Tanks for Gas Oil
-
(1) x 10,000 m³ External Floating Roof Storage Tanks for Gasoline
-
Automated Fire Detection and Fighting System
-
Pumping Station
-
5. Expansion of tank Capacity in Homs, Edleb, Hamah, for Petroleum products
-
Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”
-
Project Duration: 2005-2007
-
(3) x10,000 m³ fixed roof gas oil tanks
-
(3) x15,000 m³ external floating roof gasoline tanks
-
(1) x 5,000 m³ external Floating Roof gasoline tank
-
Truck Loading Station with Bottom Loading arms and Automation System
-
6. Ship Re-fueling Tank Farm at Tartous Port
-
Engineering, Procurement, Construction, Commissioning “EPCC"
-
Project Duration: 2006-2008
-
(2) x1,500 m³ fixed roof gas oil tanks
-
(2) x1,500 m³ fixed roof Heavy Fuel Oil tanks
-
Fire Detection & Protection System
-
Truck Loading Station with Bottom Loading arms
-
7. Ship Re-fueling Tank Farm at Latakia Port
-
Engineering, Procurement, Construction, Commissioning “EPCC"
-
Project Duration: 2006-2008
-
(2) x1,500 m³ fixed roof gas oil tanks
-
(2) x1,500 m³ fixed roof Heavy Fuel Oil tanks
-
Fire Detection & Protection System
-
Truck Loading Station with Bottom Loading arms
-
8. Pumping Station at Truck Loading Terminal for Damascus City
-
Engineering, Procurement, Construction & Commissioning “EPCC"
-
Project Duration: 2008 - 2009
-
Six Pumping Sets each with 250 m³/h @ 60m
-
Truck Loading Station with Top loading arms
-
Piping Network
-
Control & SCADA System
-