1. Banias Power Plant heavy Fuel Oil pipeline

  • Engineering, Procurement, Construction, Commissioning & Start-up "EPCC"
  • Project Duration: 2001-2002

    • Heavy Fuel oil 12”x 9.2 km pipeline, polyurethane insulated and PE coated

    • Gas Oil Flushing System comprising of tank, pipeline pumps, and network

    • Pipeline Leakage Detection System

    • Control System & SCADA

2. Aleppo Fiscal Metering Station for Natural Gas

  • Engineering, Procurement, Construction, Commissioning & Start-up "EPCC"

  • Project Duration: 2002-2003

    • Natural Gas Fiscal Metering Station at the inlet of Aleppo Power Station

    • Horizontal type filter separator

    • Flow metering system using Orifice type meters

 

3. Adra Truck Loading Automation for 35 loading arms

  • Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”

  • Project Duration: 2002-2003

    • (35) Top Loading arms for Gas Oil & Gasolin

    • Truck Loading Automation System for each individual Truck

    • Flow metering System  

    • Control System & SCADA

 

4. Lattakia new Terminal & Management offices with Storage Tanks for Petroleum Products

  • Engineering, Procurement, Construction, Commissioning & Start-up "EPCC"

  • Project Duration: 2004-2006

  • New Tank Terminal for Storing Gas Oil & Gasoline:

    • (2) x 10,000 m³ Fixed Roof Storage Tanks for Gas Oil

    • (1) x 10,000 m³ External Floating Roof Storage Tanks for Gasoline

    • Automated Fire Detection and Fighting System

    • Pumping Station

 

5. Expansion of tank Capacity in Homs, Edleb, Hamah, for Petroleum products

  • Engineering, Procurement, Construction, Commissioning & Start-up “EPCC” 

  • Project Duration: 2005-2007

    • (3) x10,000 m³ fixed roof gas oil tanks

    • (3) x15,000 m³ external floating roof gasoline tanks

    • (1) x 5,000 m³ external Floating Roof gasoline tank

    • Truck Loading Station with Bottom Loading arms and Automation System

 

6. Ship Re-fueling Tank Farm at Tartous Port

  • Engineering, Procurement, Construction, Commissioning “EPCC"

  • Project Duration: 2006-2008

    • (2) x1,500 m³ fixed roof gas oil tanks

    • (2) x1,500 m³ fixed roof Heavy Fuel Oil tanks

    • Fire Detection & Protection System

    • Truck Loading Station with Bottom Loading arms

 

7. Ship Re-fueling Tank Farm at Latakia Port

  • Engineering, Procurement, Construction, Commissioning “EPCC"

  • Project Duration: 2006-2008

    • (2) x1,500 m³ fixed roof gas oil tanks

    • (2) x1,500 m³ fixed roof Heavy Fuel Oil tanks

    • Fire Detection & Protection System

    • Truck Loading Station with Bottom Loading arms

 

8. Pumping Station at Truck Loading Terminal for Damascus City

  • Engineering, Procurement, Construction & Commissioning “EPCC"

  • Project Duration: 2008 - 2009

    • Six Pumping Sets each with 250 m³/h @ 60m

    • Truck Loading Station with Top loading arms

    • Piping Network

    • Control & SCADA System

 