Fiscal Metering Station for SLGP
Project Duration: 2004-2007
Engineering, Procurement, Commissioning & Start-up.
At end of Syrian-Lebanese 24” Gas Pipeline, including:
- Pig Launching / Receiving Stations
- Block Valves Stations along the pipeline
- Fiscal Metering Station “FMS” at Syrian-Lebanese border for 3 MSCMD “Three Million Standard Cubic Meter per Day” of Natural Gas