Fiscal Metering Station for SLGP

Project Duration: 2004-2007

Engineering, Procurement, Commissioning & Start-up.

At end of Syrian-Lebanese 24” Gas Pipeline, including:

  • Pig Launching / Receiving Stations
  • Block Valves Stations along the pipeline
  • Fiscal Metering Station “FMS” at Syrian-Lebanese border for 3 MSCMD “Three Million Standard Cubic Meter per Day” of Natural Gas