unico

Increasing Capacity of Heavy Crude Oil Pipeline

Project Duration: 2009-2011

Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”

  • Heavy Crude Oil 22”x 88 km pipeline Loops
  • Upgrading intermediate pumping stations along the pipeline
  • Fiber Optic Cable with Telecommunication System
  • Cathodic Protection System
  • Control & SCADA System
Go to top of page