PR&MS; at Banias Power Plant
Project Duration: 2001-2004
Engineering, Procurement, Commissioning & Start-up.
At the end of Homs-Banias 24” Gas Pipeline, including:
- Pig Launching/ Receiving Stations
- Block Valves Stations along the pipeline
- Pressure Reduction & Metering Station “PRMS” at Banias Power Plant for 5 MSCMDD “Five Million Standard Cubic Meter per Day” for Natural Gas