LPG Spherical Tanks in Syria
Project Duration: 2006-2008
Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”
- (3) Three Spherical tanks of 3,000 m³ each in Adra
- (4) Four Spherical tanks of 1000 m³ each in Raka, Daraa, Hamah, and Edleb
- Pumping Station with Multistage horizontal pumps
- Firefighting system