Intermediate Pumping Station in Talkalakh

Project Duration: 2008-2011

Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”

Intermediate Pumping Station for 24" Pipeline of Petroleum Products, of 35,000 m²

  • (2) Two buffer Gasoline External Floating roof tanks of 15,000 m³ each
  • (1) One Kerosene Fixed Cone Roof storage tanks of 10,000 m³
  • Boosting Pumping Station comprising of online Multistage Vertical booster pumps and multistage horizontal pumps
  • Medium Voltage Electrical system, Control, Firefighting and Utility system