Intermediate Pumping Station in Talkalakh
Project Duration: 2008-2011
Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”
Intermediate Pumping Station for 24" Pipeline of Petroleum Products, of 35,000 m²
- (2) Two buffer Gasoline External Floating roof tanks of 15,000 m³ each
- (1) One Kerosene Fixed Cone Roof storage tanks of 10,000 m³
- Boosting Pumping Station comprising of online Multistage Vertical booster pumps and multistage horizontal pumps
- Medium Voltage Electrical system, Control, Firefighting and Utility system