Arab Gas Pipeline, Phase II, Part 1

Project Duration: 2009 - 2011

Engineering, Procurement, Construction, Commissioning & Start-up “EPCC”.

  • 36” x 60 km Gas pipeline between Aleppo/ Syria and Turkish border
  • Pig Launching / Receiving Stations
  • Block Valves Stations
  • 48” casing x 50 meters boring under water irrigation concrete channel
  • Total 200 meter length of 48” casing boring under main road, railways, and water pipes network
  • Fiscal Metering Station “FMS” at Syrian Turkish border for 9 MSCM “Nine Million Standard Cubic Meter per Day” of Natural Gas